Fictional worked example — not a client or a GAFI result.

Executive summary

  • The café sells well (SAR 120,000 a month), but only 11 riyals of every 100 are left before zakat, financing and depreciation.
  • The biggest gap is team cost: 28% of sales against a Saudi café average of 16.8%. The full team is on shift in quiet hours.
  • The menu is long: 6 of 34 items make 58% of sales, and 9 items are weak on both sales and margin.
  • Three priorities for 30 days: staff scheduling, menu engineering, and materials and waste.

The business in this example

Activity
Café with a light food menu, one outlet in a residential district
Monthly net sales
SAR 120,000
Receipts
4,000 a month
Average receipt
SAR 30
Menu items
34
Data period
Three months

Where every 100 riyals of sales go

  • Materials: 35
  • Team: 28
  • Rent: 14
  • Other costs: 12
  • Left over: 11
What is left is not net profit: zakat, financing and depreciation are not included.

The tools we read a business with

Numbers alone are not enough. Each question has a recognised business-analysis tool; we explain what it measures and why it matters to you.

ToolHow it is calculatedWhy it mattersIn this example
Sales treeSales = receipts × average receiptShows whether the issue is customer numbers or order value4,000 × 30 = SAR 120,000
Prime cost(materials + team) ÷ salesThe two largest costs you control every day63% of sales
Contribution margin and break-evenFixed costs ÷ contribution margin ratioThe minimum sales that cover your costs, and how far you are from itAbout SAR 98,400 a month; 18% margin of safety
Rent burdenRent ÷ salesWhether the premises pay for themselves in sales14%
Menu engineeringClassify each item by sales volume and marginShows what to keep, feature, rework or removeFour groups (below)
80/20 ruleWhich items make most of the salesFocus effort where the effect is6 items = 58% of sales
Sales per labour hourSales ÷ team hoursWhether team size fits each part of the dayHalves between 3 and 6 pm

Three main findings

  1. Team cost is above the Saudi café average

    Evidence: 28% of sales against an activity average of 16.8% (GASTAT). The 3–6 pm period brings 9% of daily sales with a full team on shift.

    What it means: The issue is how hours are spread more than headcount.

  2. The menu is longer than the business needs

    Evidence: 6 of 34 items make 58% of sales. 9 items are weak on both sales and margin and tie up stock and prep time.

    What it means: A simpler menu cuts waste and focuses attention on the profitable items.

  3. Rent is within range, but near the top

    Evidence: 14% of sales; the published international range for cafés is 6% to 17%.

    What it means: Relief comes from selling more in quiet periods, not from the premises themselves.

Menu engineering matrix

We place each item by sales volume and contribution margin, so every group gets a clear decision.

Stars

High sales, high margin

Iced latte, chicken sandwich

Keep them, feature them, protect their quality.

Workhorses

High sales, low margin

Croissant, coffee of the day

Adjust recipe, portion or price in small steps.

Puzzles

Low sales, high margin

Saffron cake, seasonal drink

Move and rewrite them on the menu, and train the team to suggest them.

Losers

Low sales, low margin

Quinoa salad, custom juice

Remove them or replace them with an item using existing ingredients.

What if?

We calculate the effect of each change before you decide, so you know where effort pays.

ScenarioChangeMonthly effectBreak-even
Materials and wasteMaterials from 35% to 33%+SAR 2,400From 98,400 to about SAR 95,200
Higher average receiptFrom SAR 30 to 31.5 (+5%)+SAR 3,660Unchanged; sales move further above it
Staff scheduling120 fewer hours a month in quiet periods+SAR 3,000From 98,400 to about SAR 93,400

An illustrative calculation, holding everything else constant. Not a promised result.

The 30-day plan and action register

ActionOwnerWhenMeasureTarget
Spread team hours over the real peaksOutlet managerWeeks 1–2Team cost and sales per labour hour120 fewer hours without slower service
Engineer and simplify the menuOwner and chefWeeks 2–3Margin per item and average receiptAverage receipt up 5%
Control materials and wasteStock controllerWeeks 1–4Materials ratio and weekly waste valueMaterials ratio down two points

What we track every month afterwards

  • Sales, receipts and average receipt
  • Prime cost: materials and team
  • Sales per labour hour by period
  • Rent burden
  • Waste value
  • Margin of the key items
  • Customer ratings

What we cannot conclude yet

  • Seasonal effects such as Ramadan and holidays, because there are only three months of data.
  • Net profit, because zakat, financing and depreciation are not included.
  • The effect of the owner's unpaid work on the real team cost.

The tools differ by type of business

The example is a café; the same method applies to other businesses with their own tools:

BusinessWhat we measure most
Restaurants and cafésPrime cost, menu engineering, sales per labour hour, table turns, waste.
RetailGross margin, stock turn and slow stock, return on inventory, visitor-to-buyer rate, sales per square metre.
ServicesCapacity use, revenue per provider, returning-customer rate, average visit value.

Comparisons use GASTAT (Structural Business Statistics 2024) and the Australian Taxation Office small business benchmarks 2023–24. The tools draw on cost-volume-profit analysis, menu engineering (Kasavana and Smith) and the Pareto principle.

Discuss your business diagnosis

Go Ahead For Impact

First, let's establish whether we can help.

A free 30-minute introductory call to understand the challenge and potential scope. No financial uploads are needed to book. The call is not a full diagnosis.